IHRDC Logo

Discover the IHRDC Energy Glossarybeta

Search or select a letter above to browse the glossary.

Completion

The process of making a well ready for production or injection after drilling operations, which involves installing permanent equipment such as a wellhead and often includes hydraulic fracturing.