Production Facilities

Determine surface facility requirements for handling the gas and liquid production volumes established for the reservoir. Upon completion of this module, the participant should be able to : determine fluid handling and transport requirements for surface facilities and equipment, identify the surface facility components needed to handle the field’s production, specifying their capacities and pressure ratings, and generate a general surface facilities layout showing the path of the produced fluids from the wellhead to the transportation point (pipeline or loading rack).

Code: IHRDC_IPIMS_a83

$125

Duration: 8 hours